China wholesale Automotive Plastic Injection Mould Manufacturers – External Parting Car Bumper Mould with 42s Short Cycle – KAIHUA
China wholesale Automotive Plastic Injection Mould Manufacturers – External Parting Car Bumper Mould with 42s Short Cycle – KAIHUA Detail:
1.Product Introduction
We can provide customers with the best solutions for Automotive Plastic Injection Molding for Short Cycle External parting Car Bumper Mould.
Kaihua Service include: Product Design, Mold Design, Mold Making, Products Research & Development & Produce, Provide Processing Injection Molding For Tier 1.
2.Product Parameter (Specification)
| Brand | Kaihua |
| Mold Base | LKM, HASCO, DME or your requirement |
| Mold Material | P20, 718, 8407, Nak80, H13, S136, DIN 1.2738, DINt |
| Standard | HASCO, DME, MISUMI, PUNCH, or your requirement |
| Product Material | PC/ABS, ABS, PC, PVC, PA66, POM or your requirement |
| Runner | Cold/Hot Runner |
| Gate TypeProducts Size | Side gate, Sub gate, Pin point gate, Edge gate etc, or your requirement |
| Shaping Mode: | Plastic Injection Mould |
| Mold Cavity | Single Cavity / Family Molds / Multi Cavity |
| Quote | According to Samples, Drawing and Specific Require |
| Production Capacity | 2400 Sets/Year |
| Design Software | CATIA, UG |
3.Product Feature and Application
Technical Features 3: Short Cycle Mold
1.Thickness
2.Product structure
3.Simulated fill time (About 5.5s)
4.Hot runner scheme
During factory production, the machine is automatically connected to the hot runner plug.
Preheat the plug in advance at the time of mold factory test, mold matching and factory production.
5.Automatic connection system
6.Cooling channels
Mold Cooling Channels (Water channels) is one of the important systems in plastic mold.
Below are the channels of Core and Cavity respectively.
7.Automatic mold replacement
As shown in the following flow chart, the original mold of the injection molding machine is automatically replaced with other molds on the right.
8.Molding cycle
Mold closing, injection molding, cooling, mold opening, ejection, part taking, resetting, mold closing. The total time for a complete production cycle is 42 seconds.
10.Cooperation Cases
Product detail pictures:
Related Product Guide:
Our firm since its inception, normally regards item top quality as company life, constantly make improvements to generation technology, improve product excellent and repeatedly strengthen organization total good quality management, in strict accordance with the national standard ISO 9001:2000 for China wholesale Automotive Plastic Injection Mould Manufacturers – External Parting Car Bumper Mould with 42s Short Cycle – KAIHUA , The product will supply to all over the world, such as: Malawi, Islamabad, New York, We've got constantly insisted on the evolution of solutions, spent good funds and human resource in technological upgrading, and facilitate production improvement, meeting the wants of prospects from all countries and regions.
It is not easy to find such a professional and responsible provider in today's time. Hope that we can maintain long-term cooperation.











